R & T Water Supply Association

R & T WATER SUPPLY ASSOCIATION WATER TREATMENT FACILITY AND RAW WATER IMPROVEMENTS

RAY, NORTH DAKOTA

Work generally included a 500,000 gallon concrete clearwell; a 100,000 gallon backwash reclamation basin; two 50,000 gallon lime softening basins; two 20,000 gallon re-carbonation basins; a 10,800 square foot cast-in-place and precast concrete water treatment facility structure; two (2) forced draft aerators; four (4) concrete gravity filters; two (2) dedicated vertical turbine backwash pumps; an air backwash blower; a high service pumping system consisting of seven (7) vertical turbine pumps; one (1) 105 ton lime silo, two (2) lime day bins, volumetric feeders and slakers; one (1) carbon dioxide storage and two (2) feed systems, miscellaneous chemical feed systems; miscellaneous process pipe ranging from 3-inch to 16-inch, valves, valve operators, fittings, and ancillary appurtenances; interior masonry construction; interior and exterior doors and windows; and associated Work.

Site Work included: PVC and ductile iron site piping ranging in size from 6-inch to 16-inch; site valves, fittings, and hydrant; manholes; overflow and drain tile outfall structure; (2) lime sludge retention ponds; approx. 8,000 cubic yards of borrow material; approx. 1,000 cubic yards of aggregate surface and base course material; gravel surface access road and concrete pavement parking area construction; sidewalk areas; WTF domestic sanitary system construction including septic tank and drain field site grading, landscaping, and seeding; sludge lagoon site fencing and access gates; three (3) production wells including well field piping, valves, air release manhole, and blow-off assembly; and associated work.

SOLUTIONS PROVIDER.

Industry leading partner providing upfront and creative solutions for all your building solutions needs while minimizing business disruptions from project inception to completion.